This website uses cookies

Read our Privacy policy and Terms of use for more information.

Two crew leads inspect a closed portable-ladder approach and upper landing from ground level while the receiving crew waits nearby.

Check where the ladder ends before anyone climbs

We would not open this ladder route just because the same ladder worked yesterday. A delivery can narrow the base, deck work can move the step off, and a door can swing into the approach. The ladder and the upper landing are one route, so check them together.

Three things we want settled

  1. Name the landing. Point to the exact level and place where people will step off. Verify that the side rails extend at least three feet above that landing. If the ladder cannot extend that far, the OSHA exception calls for a rigid top support and a grasping device. Keep the route closed if the setup does not meet the applicable requirement.

  2. Look at both ends. Check the base, the approach, and the step off. Move carts, material, and equipment that could strike or shift the ladder. If workplace traffic can displace it, settle the securing or barricade before the first climb.

  3. Name the person who can reopen it. If the landing, support, or approach changes, close the route. Give the crew another way through, then have the responsible lead check the new condition before use resumes.

Put the landing and the recheck owner in the free Construction Risk Radar. That keeps a closed route from becoming the next crew's default.

What the source says

OSHA 29 CFR 1926.1053(b)(1) connects the rail extension to the upper landing. Paragraphs (b)(6) and (b)(8) address stability and the risk of displacement from workplace activity. Paragraph (b)(9) requires the areas at the top and bottom to stay clear.

Our handoff would name the landing, say whether it is open, identify the alternate route, and name the person responsible for the next check. That is more useful than telling the next crew to use the ladder by the north bay.

Source note: OSHA 29 CFR 1926.1053(b)(1), (6), (8), and (9), reviewed November 7, 2026. Apply the full standard, the manufacturer instructions, and the site access plan.

If a crew is taking over this access route, send this note to its lead. Your personal referral link is below.

Recommended for you

View all
caret-right