Match the signal plan to the blind part of the lift
A radio channel written on a lift plan is not enough. We would leave the load on its starting blocks until the operator and signal person agree on who is signaling, how the signal gets through, and what stops the move.

THE DIG DAILY DOSE
Before the Blind Lift Starts, Confirm One Signal Plan
OSHA 29 CFR 1926.1419 requires a signal person when the point of operation is not in full view, when the direction of travel is obstructed, or when site specific concerns make signaling necessary. The method has to fit the actual path and site conditions.
Three checks before the pick
Trace the blind portion. Point to every place where the operator loses a full view of the load path or landing. Confirm where the signal person can see the load, the landing, and the operator's response.
Verify the person and the method. The employer must ensure that each signal person meets the qualification requirements before signaling. Check the site documentation for the hand, voice, radio, or other method in use.
Test communication and the stop rule. Agree on the signals before the operation. If transmission breaks or the operator becomes aware of a safety problem, stop safely. Do not resume until communication is restored and the problem is resolved.
Put the blind path, signal person, method, and stop condition in the free Construction Risk Radar.
What we want both people to say out loud
Only one person may signal the crane at a time, except for the emergency stop circumstances in the standard. Signal person documentation must be available at the site and identify each type of signaling for which that person is qualified. The qualification requirements are in OSHA 29 CFR 1926.1428.
Before the lift starts, ask the operator and signal person to identify the blind section, the method, the assigned signaler, and the stop condition. If one answer is uncertain, keep the load down.
Source note: OSHA 29 CFR 1926.1419 and 1926.1428, reviewed November 13, 2026. Apply the full crane standard and the approved lift plan.